Page 128 - 2018 Defense White Paper
P. 128

2. Major Force Enhancement Projects and 2019 – 2023
             Defense Mid-Term Force Enhancement Plan



           |  2017 Force Enhancement Projects  |    The 2017 defense budget amounted to KRW 40.3

           trillion, of which KRW 12.2 trillion was allocated to the force enhancement budget, representing
           a 4.5% increase from 2016. The major force enhancement projects for 2017 are shown in [Chart
           4-7].



           [ Chart 4-7 ]  Major Force Buildup Projects in 2017

                Weapons Systems           Ongoing Projects                New Projects
                                       High-altitude reconnaissance

               Battlefield Awareness/
                                     unmanned aerial vehicle          Upgrade of the Military Information
              Command and Control,
                                         Tactical Information Communication   Management System
                 Communications
                                     Network (TICN)
                                                                      Explosives detection and removal
                                         K-2 tank, large attack helicopter
                                                                  robot (R&D)
                 Maneuver/Fires          230mm Multiple-Launch Rocket
                                                                      Unmanned lightweight combat
                                     System (MLRS)
                                                                  vehicle (R&D)
                                         Gwanggaeto III–class destroyer
                 Maritime Assets     (Batch II)                       Maritime patrol aircraft II
                                         Jangbogo III–class submarine (Batch I)
                                         F-35A
                   Air Assets                                         Precision approach radar (PAR)
                                         Aerial refueling tanker



           |  2018 Force Enhancement Projects  |    The 2018 defense budget amounted to KRW 43.2
           trillion, of which KRW 13.5 trillion was allocated to the force enhancement budget, representing

           a 10.8% increase from 2017. The major force enhancement projects for 2018 are shown in [Chart
           4-8].




















           126    Chapter 4  Building Elite Armed Forces Using Advanced Technology
   123   124   125   126   127   128   129   130   131   132   133